Factory Plan Approval

Design Right. Comply Early. Build Safely.

Before you start factory construction or production, your factory layout plan must be approved by DISH / Chief Inspector of Factories under the Factories Act, 1948.
OM Consultants makes this approval process clear, compliant, and hassle-free.

What Is Factory Plan Approval?

Factory Plan Approval is the official permission that your proposed layout, structure, and processes:

  • Meet legal, safety, and welfare standards
  • Are structurally safe and logically planned
  • Have proper machinery, ventilation, sanitation, and fire safety

It’s the green signal to legally start construction or production.

Legal Requirement under the Factories Act, 1948

As per Sections 6 & 7:

  • You must submit the proposed factory plan to DISH / Factory Inspectorate
  • You must obtain written approval before construction/installation
  • Any extension or layout change must be re-submitted

Non-compliance can mean: delays, penalties, and factory licence rejection.

Why Factory Plan Approval Matters

  • Legal Compliance – Avoid shutdowns and legal action
  • Safety Validation – Structural, fire, and health safety confirmed
  • Smooth Licensing – Mandatory for factory licence
  • Layout Efficiency – Better workflow and material movement
  • Inspection Readiness – Approved layouts pass audits smoothly
documents required

Documents Required listing:

Document Description
Application Form (as per State Rules)
Official request for plan approval
Site Plan & Layout Plan
Shows building footprint, dimensions, legends
Machinery List with power ratings
HP/kW details for safety & load assessment
Process Description / Flow Chart
Shows production steps and potential hazards
Ownership Proof / Lease Agreement
Confirms lawful occupation of premises
Stability Certificate
Certifies structural safety of building
Fire & Safety NOC
Confirms fire protection arrangements
Declaration Form (Occupier/Manager)
Mandatory compliance declaration
Building Drawings (AutoCAD/PDF)
Technical basis for DISH scrutiny
Utility Plan (water/drainage/electrical)
Validates safe utility and workflow planning

How OM Consultants Helps with Factory Plan Approval

Our Core Services

  • Factory layout & safety compliance audit

  • Documentation and form preparation

  • Preparation & validation of building and machinery drawings

  • Online/offline submission to DISH / Inspectorate

  • Liaison, inspection support, and query resolution

Coordination till final approval certificate is issued

Step-by-Step Breakdown of Our Key Services

Best Practices for Factory Plan Approval

We design and file plans that:

  • Use correct scale, symbols, and orientation
  • Clearly highlight exits, movement paths, and clearances
  • Show accurate machinery spacing and risk zones
  • Include complete fire & safety layouts
  • Attach all required certificates and declarations

This ensures faster, cleaner approvals.

omc - partnership

Why Choose OM Management Consultants

  • 20+ years of Industrial Compliance Experience.

  • Trusted by 1000+ factories across India.

  • End-to-end documentation & Government liaison support.

  • Dedicated team ensuring 100% statutory compliance.

  • Trusted by leading brands across multiple manufacturing sectors.

We transform complex legal requirements into a Smooth, Predictable, and Stress-free process — protecting your business from penalties, delays, and compliance risks.

Ready to Ensure 100% Compliance?

Don’t let paperwork delay your project.
OM Consultants handles your Factory Plan Approval from review to final certificate — with full compliance and minimum rework.

Frequently Asked Questions

Who approves the factory plan?

The Chief Inspector of Factories or the Directorate of Industrial Safety & Health (DISH) of your state.

Is factory plan approval required for modification or expansion?

 Yes. Any structural or machinery layout change must be re-approved

What is the typical timeline for approval?

 Usually 30–45 working days, depending on documents and department workload.

Can a consultant help with re-approval after rejection?

Yes. OM Consultants identifies deficiencies, corrects drawings/documents, and re-submits.

Do I need separate approvals for different factory blocks?

 If blocks have separate operations or risk zones, separate layout approvals may be needed.

What happens after approval?

 You can proceed with installation/construction and apply for the Factory License.

How often should I renew my factory license after approval?

Licences are renewed annually or as per your State Factory Rules.